Steam roller crusher maintenance measures:

  1. No matter how the material is fed to the crusher, a reliable rust removal device must be provided to prevent other debris from entering the broken machine.

  2. Check the oil level in the main and auxiliary drive gearboxes to ensure adequate oil supply.

  3. The crusher must be started at no load. The retained material in the crusher must be inspected and removed before starting. Check the oil level in the main and auxiliary drive gearboxes to ensure adequate oil supply.

  4. Start the crusher to reach the normal speed, and start feeding without any abnormality.

  5. If the crusher is deactivated for a long time, or it is started for the first time, the large pulley should be turned by hand for 2-3 weeks to confirm that the machine is running freely, and then the motor is “joged”. Several times, when the motor rotates in the correct direction, the crusher can be officially started.

  6. Regularly check whether the crusher product particle size meets the requirements. The spacing of the crushing rolls can be readjusted if necessary.

  7.Be sure to stop the feeding before the normal shutdown, and all the materials in the standby can be stopped after the crusher is removed.

  8. The main and auxiliary transmission gearboxes of the crusher are lubricated with gear oil, and the lubricating oil in the tank should be replaced in time during summer and winter.

  9. When changing the strength, particle size or crushing ratio of the crusher material, the nitrogen pressure of the buffer cylinder should be reset. The amount of pressure is moderate to meet the needs of the crushing roller pressing force. Excessive compression forces can cause increased wear and increased power consumption. Too small a pressing force will increase the super-granules of the crushed product and cause the active crushing roller to exhibit frequent vibration. The buffer cylinder nitrogen pressure is used in the range of 1.5-4 MPa.

  10. After the crusher is overhauled, when reassembling the upper crushing roller and the shell coupling, the round nut and the coupling bolt should strictly control the tightening torque. When tightening the clamp coupling bolts, it is necessary to pay attention to the sequence. The diagonal bolts should be tightened first, then the intermediate bolts should be tightened, and the gaps on both sides of the joint should be uniform.

  11.Maintenance and repair If you need to open the cover of the main and auxiliary drive gearboxes, you must replace the rubber seals and evenly apply a layer on the static seal surface before reinstalling. Sealant to prevent oil leakage and oil leakage on the sealing surface.

  12. The bearings of the upper and lower crusher roller translation linkages of the crusher are greased and lubricated. The design requires the use of No. 2 or No. 3 calcium-based grease. The oil cup cover should be tightened one week for each week of normal production to inject grease.
(provided by Shenyang Building Materials Network) <


Relevant recommended products

White PVC Semi Privacy Fence for Gate and Garden

Agricultural Tractor Disc Series Cultivator 3ZT

TTC8018-12Flat type tower crane tower crane

Garden Artificial Grass for Decoration and Greening

Ceiling Tee Grid for Suspension System Use Design

Leave a Reply

Your email address will not be published. Required fields are marked *